亚洲国产精品五月天久久久,麻豆一区二区三区精品视频 ,最新在线观看视频地址欧美亚洲,思瑞精品1区2区3区,日本一区二区在线视频,99RE久久这里只有精品最新地址,午夜理论韩国日本香港理论,国内精品久久久久野战,亚洲一区二区三区乱码,农民工特黄A片九九视频

Fixed Competitive Price Auger Pile Machine Manufacturer - JB170 Hydraulic Walking Piling Rig – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company insists all along the quality policy of "product good quality is base of enterprise survival; buyer fulfillment will be the staring point and ending of an company; persistent improvement is eternal pursuit of staff" and also the consistent purpose of "reputation very first, shopper first" for 60 Multifunction Hydraulic Drilling Rig Manufacturer , Trd-80e Trench Cutting & Re-Mixing Deep Wall Series Method Equipment , Dzj240 Electric Driven Vibratory Hammer , If needed, welcome to help make speak to with us by our web page or cellular phone consultation, we are going to be delighted to serve you.
Fixed Competitive Price Auger Pile Machine Manufacturer - JB170 Hydraulic Walking Piling Rig – Engineering Machinery Detail:

JB170 Hydraulic Walking Piling Rig2

Product Features
HYDRAULIC WALKING PILING RIG
1. MORE EFFECTIVE, STABLE AND DURABLE
The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
Weight carrier of bigger load bearing.

2. EASY FOR ASSEMBLY AND TRANSPORATION
Modular structure design, easy for assembly and disassembly.
Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for?transportation.

3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
Hydraulic actuated winch control levers allow well performance and easy control.
Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

TECHNICAL PERFORMANCE CHARACTERISTICS OF JB170
1. JB170 leader can be extended up to 53m, with the ultra-deep ZLD three-shaft?Agitating Auger, the maximum construction depth can reach 46m, together with?ZLD five-shaft agitating auger, it can drill holes of depth up to 30m.

2. JB170 contains 8 lifting cylinders, increase site adaptability.

3. Unique positioning structure design guarantees a self-erect without help of?service crane. JB170 can make 53m height.

4. JB170 hydraulic oil tank enclose with good appearance and prevent excessive?shine, Protect oil tank and filter at construction site.

5. Leader’s inclination angle lift up to 70°, JB170 will set alarm by built-in alarm?device (optional), to prevent it excessive tilt.

6. Removable operator’s room, easy for load and transport, ensure effective work.

Product Model: JB170
Specifications

Item JB170 HydraulicWalking Piling Rig JB170A HydraulicWalking Piling Rig
Total length of leader (m) 23~53
Diameter of leader (mm) ?1120
Center distance between leader and mounted equipment (mm) 600×?101.6 1000×?101.6
Leader inclination angle (left to right) (°) ±1.5
Backstay stroke (mm) 2800
Leader trimming cylinder stroke (mm) 400
Max. auger model ZLD330/85-5-M3-S
Max. diesel hammer model D160
Max. leader length (m) 53
Max. pulling force (with Max. leader) (KN) 743
Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 120max
Winding and rewinding peed (m/min) 0~21
Rope diameter (mm) ?22
Drum capacity (m) 750
Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 110max
Winding and rewinding peed (m/min) 0~18
Rope diameter (mm) ?22
Drum capacity (m) 300
Swing angle (°) ±10 ±8
Transverse travel Travel speed (m/min) ≤4.5
Travel step (mm) 3100
Vertical travel Travel speed (m/min) ≤ 2.7
Travel step (mm) 800
Uplift of the track Speed (m/min) ≤ 0.55
Height (mm) 450
Distance between tracks Working (mm) 9100
Travelling (mm) 4700
Distance between pulleys in track Working (mm) 5600
Travelling (mm) 4700
Transverse-moving track Length (mm) 10130
Width (mm) 1400/1200
Vertical-moving track Length (mm) 6900
Width (mm) 1700
Connection between outrigger beam and platform Pin rotary, cylinder expanding
Average ground pressure (MPA) ≤0.1
Motor power (kw) 45
Hydraulic crowded system (MPA) 25/20
Hydraulic crowded system operation Manual & electric control
Total weight of piling rig (T) ≈175 ≈180

Note: Specifications are subjected to change without prior notice.

Application

HANGZHOU PROJECT Product: Long Auger&JB170

SHANGHAI PROJECT Product: ZLD330&JB170

JB170 Hydraulic Walking Piling Rig3
JB170 Hydraulic Walking Piling Rig4

Service
1. FREE-CALL CENTER SERVICE
We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

2. CONSULTANCY & SOLUTIONS
Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

3. TESTING & TRAINING
SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.
We will offer training on site if it is necessary, to make sure you know the correct
way for maintenance, analysis and debugging of the malfunctions.

4. MAINTENANCE & REPAIR
We have offices in many places in China, easy for maintenance.
Sufficient supplies for spare parts and wearing parts.
Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

5. CUSTOMERS & CONNECTIONS
After-sale customer file was set up for better understanding your need and feedback.
More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

THE GLOBAL MARKETING NETWORK
Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


Product detail pictures:

Fixed Competitive Price Auger Pile Machine Manufacturer -
 JB170 Hydraulic Walking Piling Rig – Engineering Machinery detail pictures

Fixed Competitive Price Auger Pile Machine Manufacturer -
 JB170 Hydraulic Walking Piling Rig – Engineering Machinery detail pictures


Related Product Guide:

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" plus the theory of "quality the basic, have faith in the main and management the advanced" for Fixed Competitive Price Auger Pile Machine Manufacturer - JB170 Hydraulic Walking Piling Rig – Engineering Machinery, The product will supply to all over the world, such as: Mombasa , Irish , Poland , With a team of experienced and knowledgeable personnel, our market covers South America, the USA, the Mid East, and North Africa. Many customers have become our friends after good cooperation with us. If you have the requirement for any of our products, please contact us now. We are looking forward to hearing from you soon.
  • We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Penny from Georgia - 2017.04.18 16:45
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Elsie from Yemen - 2018.05.15 10:52

    Related Products